Skanska Revit-MEP Prefabrication | Ford Assembly Line Flash Back?

henry_ford_assembly_line_getty_imagesSimilar to Henry Ford’s revolutionary assembly line processes; BIM processes are reshaping the MEP  design and construction (manufacturing) processes for facility projects.

Ford’s automated automobile assembly-line process; reduced labor time & costs, while reducing material waste with modular, standardized parts.

Sheer production of the Model T dramatically increased. The production time for a single car dropped from over twelve hours to just 93 minutes due to the introduction of the assembly line.

design_build_mep_prefabrication_skanska_01Skanska Construction’s BIM MEP Prefabrication construction processes are highlighted online via Tradeline with an insightful, visual article;

Building Blocks: Offsite Prefabrication Saves Time and Money — Compressed Work Schedules, Worker Safety, and Access to Constrained Sites Top Benefits

Several maturing, project delivery processes are integrated to produce more efficient, ‘manufacturing-oriented’ design and construction processes.

  1. Building Information Modeling (BIM),
  2. Design-Build,
  3. Integrated Project Delivery (IPD),
  4. Cloud Computing & Mobile Technologies
  5. Lean Construction
  6. BIM: Design to Fabrication Workflow
  7. Prefab & Modularization,

BIM Means Business for Plumbing Heating-Cooling Contractors

design_build_mep_prefabrication_skanska_03 Based on recent McGraw-Hill’s SmartMarket Reports –today’s processes are reducing the  unrecoverable [Time + Labor + Material] costs. These costs are\were typically absorbed by a project’s design and construction businesses. Thereby, resulting in higher bids to owners on future projects –to cover the ‘unknown’ costs that ‘might’ incur.

The Ford assembly line significantly improved the car quality; while greatly reducing the retail price. A more affordable automobile serviced a much larger customer base.

The cost of the first Model T was set at $850… The assembly line cost of the Model T would eventually drop to $260 in 1924

BIM Means Business | Plumbing Engineer Magazine – ASPE Article

Construction Worker and Owner Benefits: Skanska prefab processes utilize Lean Construction processes; that are safer, more efficient and less costly.

  1. Horizontal mechanical, electrical and plumbing multi-trade prefabrication modules are fabricated and assembled in an offsite construction facility.
  2. The typical layout of an offsite construction facility provides optimal adjacency for tools, raw materials, and personnel.
  3. Work that would normally require ladders and lifts is brought to hip-height racks on a warehouse floor in an offsite construction facility.
  4. Building components and systems are prefabricated on racks within a spacious, environmentally controlled work space –then transported to the project site.

Greenbuild | Pedia-Pod Modular Pediatric Patient Unit

Related Articles

McGraw-Hill SmartMarket Report | Prefabrication and Modularization | BIMDownload McGraw-Hill SmartMarket Report | Prefabrication and Modularization

Modular Prefabrication | Design-Construction Success for Healthcare Design

Bradley BIM Articles

Download Complete Bradley Revit Family Library – Download All Options - 1000 Revit Family ModelsDownload Complete Bradley Revit Family Library (1000 Families) – Download All Options

Download Bradley Revit Family Library From Autodesk Seek Building Product Manufacturer Revit Library

About Daniel Hughes

Daniel Hughes is an Expert Revit-BIM Consultant and Author of BradleyBIM.com Here's a short list of his industry credentials: * Classroom & Onsite Revit Training to more than 700 professionals since 2002. * Senior Revit Technical Project Manager on more than $5 Billion of Client Projects * Senior Revit Implementation Manager to more than 130 national design, engineering and construction firms since 2002. * Expert Onsite-Online Revit Trainer-Implementation Consultant * Master Family Modeler * National Educational Author, Speaker & Blogger * Corporate owner for 15 years; serving national & international clients.
This entry was posted in Bradley BIM, Construction Revit BIM, Government Revit BIM, Owners Revit BIM, Revit-BIM Trends and tagged , , , , , , , . Bookmark the permalink.

6 Responses to Skanska Revit-MEP Prefabrication | Ford Assembly Line Flash Back?

  1. Pingback: Download Managing Uncertainty-Expectations in Building Design-Construction McGraw-Hill Report | Bradley BIM | Revit -ArchiCAD -Bentley -Vectorworks

  2. Pingback: Visit Keltech AHR Expo Booth #2065 | Chicago Jan 26-28 | Revit Model Library | Bradley BIM | Revit -ArchiCAD -Bentley -Vectorworks

  3. Pingback: BIM Level-of-Development Drives BIM Return-on-Investment

  4. Pingback: Bradley BIM Initiative Evolution | 5 Roles as BIM Project Partner | Bradley BIM | Revit -ArchiCAD -Bentley -Vectorworks

  5. Pingback: SysQue Provides Bradley Revit – Autodesk Fabrication Model Library | Bradley BIM | Revit -ArchiCAD -Bentley -Vectorworks

  6. Pingback: Sustainable-Green Revit Commercial Tankless Water Heater Library | Bradley- Keltech | Bradley BIM-Revit Resource Portal

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s